Demolition Of Corah Factory, Barnsley

Consisting of extensive steelwork, the steelwork was sheared down in approximately 14 days. The concrete slab was lifted in 7 days, including massive chimney bases. All materials were crushed for reuse in a further 14 days.

Demolition of Corah Factory in Barnsley

Demolition of Evans Halshaw (Ford Dealership), Sutton in Ashfield

Extensive portal-framed service buildings ranging from 50 x 30 metres to 20 x 10 metres  were dismantled and resold, with re-erection facilities provided if required.

This 35,000 m2 site was cleared in under 10 weeks, including breaking out and crushing the extensive concrete slabs.

Demolition of Evans Halshaw

Demolition of Tilworth Grange Hospital, Hull

The demolition of Tilworth Grange Hospital in Hull, a site with 10 acres and various period buildings was undertaken and completed in 12 weeks, in preparation For a substantial house building project by another developer.

LINBRO carried out the principal contractor duties which included the organisation of extensive asbestos removal.

Demolition of Tilworth Grange Hospital

Grappling with debris at Tilworth

Firstly, the demolition rubble is pulverised by the excavator to break out reinforcing bars in the concrete rendering the feed material to the jaw crusher free of debris and trash hence maximum productions achieved. Secondary crushing is achieved by tracked jaw crusher which usually produces 75 mm down product however,

Demolition of Tilworth Grange Hospital